Services
Environmental feasibility assessed before capital enters the site
Discovering an environmental restriction late costs schedule and asset value. Feasibility analysis surfaces legal and physical restrictions before the investment decision.
When you need it
- Land or asset acquisition with undeveloped area
- Choosing between locational alternatives
- Area suspected of protected riparian zones, springs, mangrove or advanced-stage vegetation
- Lender or investment committee requirement
What you get
- Legal restriction check: protected areas, legal reserve, conservation units, zoning
- Field survey of vegetation cover and water bodies
- Estimate of usable area and offset liability
- Restriction map and occupation scenarios
- Feasibility opinion with risks and permitting paths
How we run it
- 01
Document review
Title, zoning and official geodata.
- 02
Field
Verification of the site's actual condition.
- 03
Mapping
Overlay of restrictions on a georeferenced base.
- 04
Opinion
Scenarios, estimated environmental cost and recommendation.
Frequently asked questions
- Does feasibility replace permitting?
- No. It informs the investment decision and designs the permitting path, which is then executed.
- How long does the opinion take?
- It depends on size and site access; small urban plots are usually faster than large rural tracts.
Sectors served
Real estateIndustry
