Services

Authorized clearing and pruning, executed within what was permitted

Cutting trees without authorization, or beyond the authorized volume, is an administrative offence with per-tree fines and embargo risk. We handle the clearing request and control what is executed.

When you need it

  • Construction requiring removal of trees
  • Urban pruning subject to municipal authorization
  • Tree at risk of falling in a circulation area
  • Control of the balance between authorized and executed

What you get

  • Technical clearing or pruning report signed by the responsible professional
  • Preparation and filing of the authorization request
  • Quantities per species and georeferenced individuals
  • Technical supervision of field execution
  • Dashboard of authorized, executed and remaining volume

Delivered work

  • Authorized Vegetation Clearing (ASV) for project implementation and control of damage to assets

Field execution

Pruning and clearing carried out after the permit is issued, with licensed crew and registered equipment.

Technical responsibility

  • Forest Engineer — with active technical responsibility record (ART) for tree pruning and clearing.
  • CREA-PE — valid professional registration for field technical supervision.
  • Environmental permits — ASV, tree pruning and vegetation suppression in APP or legal reserve areas.

All field work is conducted under the guidance of a licensed technical manager and with the environmental documentation required by the competent agency.

AD Consultoria Ambiental operator in the field: environmental services conducted in compliance with environmental law
Legal security starts before the first stake: environmental services in compliance with the law.
AD Consultoria Ambiental technical team overseeing vegetation suppression at every stage of the process
Serious vegetation suppression requires technical oversight at every stage.
Articulated platform positioned for pruning a large tree at an urban construction site
Pruning at height with articulated platform in an urban area
  • Work supervised by a technical manager, a Forest Engineer, with technical responsibility record (ART).
  • Cutting starts only after the environmental permit is issued by the competent agency.
  • Operators licensed to carry and operate chainsaws, with equipment registered at IBAMA (Law 12.651/2012, art. 69).
  • PPE under NR-6 and work at height under NR-35 when a platform is used.

How we run it

  1. 01

    Survey

    Identification and assessment of individuals.

  2. 02

    Report

    Technical document with justification.

  3. 03

    Authorization

    Filing and responses to agency requirements.

  4. 04

    Execution

    Supervision and record of what was cleared.

Frequently asked questions

Does pruning also require authorization?
Generally yes in urban areas for trees, under municipal rules. Emergencies follow a specific track but still require notification.
What if the site clears more than authorized?
That is unauthorized clearing, subject to fines and extra offsetting. Hence the balance control per authorization.

Sectors served

Real estateEnergy and infrastructureRetail and malls

Related services

Contact us